FIT-FOR-PURPOSE DELIVERY

SSI delivers under EPC, EPCM, or Construction Management models, reflecting how owner-operators want to manage risk, control, and accountability. For brownfield work, the model also accounts for the operating asset, work window, and handoff into startup.

SELECT YOUR DELIVERY MODEL

The right model depends on how you want to manage risk, where you want control, and how much accountability you require us to hold.

EXECUTION ON THE GROUND

Supervision, field engineering, Quality Assurance/Quality Control (QA/QC), quantity surveying, subcontractor coordination, and project controls report through one chain. The project team sees field progress, cost movement, and workface readiness from the same source.

Staged to the Early Plan

Materials, permits, isolations, tools, and labour are staged to the daily plan before the shift starts. Crews receive a defined scope with the workface ready to support it.

Tracked Against the Workface

Progress is measured against plan with field-verified data and earned value. When schedule or cost moves, your team sees what changed and what decision is needed next.

Execution Plan Built Around Site Constraints

Site constraints are carried into the field plan before mobilization, including access, heavy-haul routes, crane pads, laydown, permit windows, environmental restrictions, and live-plant conditions.

BUILDING AROUND LIVE OPERATIONS

On a brownfield job, work must progress without disrupting the operating plant. We map the interface between construction and operations before permits are issued, so permits, isolations, operating requirements, and construction sequence are planned together as new systems are tied-in.

CORE CAPABILITIES

  • SIMULTANEOUS OPERATIONS (SIMOPS) MANAGEMENT
  • LIVE PLANT TIE-INS AND RETROFITS
  • OUTAGE AND TURNAROUND EXECUTION
  • VERIFIED ISOLATION TRACKING

Two workers in hard hats and high-visibility vests standing on an industrial site at sunset, one pointing toward plant structures in the distanceTwo workers in hard hats and safety gear reviewing information on a tablet together at an operating plantLarge insulated process piping and valves running through an outdoor industrial facility

OUTAGES & TURNAROUNDS

We staff and manage the construction scope during planned shutdowns. We coordinate with operations scheduling to compress the construction window, stage materials and labour to the outage plan, and close the scope before restart.

TIE-INS AND RETROFITS

For capacity expansions, debottlenecking, and retrofits on a running plant, construction is planned around outage windows and operating conditions. Each connection point is scheduled against both the project plan and the facility's constraints.

FACILITY INSPECTIONS & PROCESS SAFETY MANAGEMENT

We provide field resources for facility inspections and process safety management, supporting the owner's integrity management program.

BUILT FOR OPERATIONAL READINESS

Whichever delivery model you choose, SSI manages construction with turnover and startup in view. Turnover records and startup requirements are tracked as the job moves towards mechanical completion and Ready-for-Operations.